DEPLOYABILITY TEST PLAN
ASSET TRACKING LOGISTICS AND SUPPLY SYSTEM - PHASE TWO PLUS
(ATLASS II+)
1. ...
(4) ATLASS II+ will operate using Commercial Off The Shelf (COTS) hardware, consistent with DoD and Marine Corps standards, as published in the DoD Joint Technical Architecture and Marine Corps Technical Plan. ... Modifications to the organizational structure of supply and maintenance management sections may emerge from the employment of ATLASS II+; however, no such requirements were identified during the Pilot Site Test or Operational Test. ... As with any system, mission planning factors such as deployability, lift, supportability, sustainment, survivability, and operational capabilities must be addressed for ATLASS II+ in all contingency and operations plans.
Approximate Word count = 2100 Approximate Pages = 8.4 (250 words per page double spaced)
|
|
|
|
|
|